MLOEA and EREs
What you need to know.
Where a main connection is not exclusively used for transport, the metering setup becomes critical. A formal secondary allocation point can be one route for separately identifying electricity delivered to transport.
What does ERE Market
look at?
Check whether there is a formal secondary allocation point
Record the relevant EAN and metering data
Connect the metering chain to the transport use
Have the technical setup assessed before booking
From information
to a real assessment.
This page explains what may be possible. The ERE Check then looks at your own machines and operating hours. After that, you can submit the ERE application and mandate.
Start the ERE application →