MEASUREMENT · EVIDENCE

MID metering and ERE booking
What you need to know.

The ERE system is built on measured electricity. Where a connection or secondary allocation point is not exclusively for transport, the meter must meet the applicable MID requirements.

SHORT ANSWERA MID-certified meter provides a regulated basis for measuring the electricity delivered at the relevant delivery point. ERE Market checks the meter type, installation and evidence as part of the dossier.
PRACTICAL

What does ERE Market
look at?

01

Identify the meter at the actual delivery point

02

Keep the MID certificate or conformity evidence

03

Make sure the meter is actually used in the relevant charging point

04

Keep meter/session data available for verification

NEXT STEP

From information
to a real assessment.

This page explains what may be possible. The ERE Check then looks at your own machines and operating hours. After that, you can submit the ERE application and mandate.

Complete your ERE application
SHARE / CAMPAIGN

Your electric fleet already consumes valuable energy. Are you capturing the ERE value behind it? ERE Market takes the chain off your hands — from technical assessment and measurement to booking and sale. See what your electric fleet could be worth: https://eremarket.nl/en/ere/mid-meter